Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of the following Project: Industrial Park #1 Water Improvements. The Project includes the following approx quantities of work: 1. 5,500 LF of 12" water main. 2. 1,000 LF of 10” through 6" water main. 3. 54 Service Assemblies.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The site development including and installation of a new water tower. Work includes approx. 1 LS 3,000,000 Gal composite elevated water storage tank, 20 CY additional concrete for footings, 20 CY additional excavation, 1 LS clearing & grubbing, 85 CY aggregate base, 18 Gal non-tracking tack coat, 640 FT fence, 53 SF 5" concrete sidewalk, 50 LF 4" conduit storm repair, 225 LF 6" PVC SDR-35 sanitary sewer,242 LF 16" water main, 1 EA 16" butterfly valve, 1 EA 6" fire hydrant, 4,250 SY seeding & mulching, 5,000 EA erosion control, 1 Allow SCADA system.
Posted Date
Dec 15, 2025
Due Date
Jan 8, 2026
Release: Dec 15, 2025
Close: Jan 8, 2026
The site development including and installation of a new water tower. Work includes approx. 1 LS 3,000,000 Gal composite elevated water storage tank, 20 CY additional concrete for footings, 20 CY additional excavation, 1 LS clearing & grubbing, 85 CY aggregate base, 18 Gal non-tracking tack coat, 640 FT fence, 53 SF 5" concrete sidewalk, 50 LF 4" conduit storm repair, 225 LF 6" PVC SDR-35 sanitary sewer,242 LF 16" water main, 1 EA 16" butterfly valve, 1 EA 6" fire hydrant, 4,250 SY seeding & mulching, 5,000 EA erosion control, 1 Allow SCADA system.
Premium
Access the largest public sector contact database
City of Great Bend seeks proposals to refurbish and repair the 200,000‑gallon elevated Airport Industrial Park water tower, covering steel repairs/modifications, removal/installation of ladders and fall‑protection systems, roof and vent work, overflow modifications and removal of secondary overflow tank, installation of an IXOM GridBee GS‑9 (or approved equal) tank mixing system, interior/exterior SSPC‑SP10 abrasive blasting and specified multi‑coat tank coating system, coating touchups, level gauge repair, O&M manual, and compliance with bonding/insurance and reference requirements. Mandatory site visit required.
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
Close: Jan 15, 2026
City of Great Bend seeks proposals to refurbish and repair the 200,000‑gallon elevated Airport Industrial Park water tower, covering steel repairs/modifications, removal/installation of ladders and fall‑protection systems, roof and vent work, overflow modifications and removal of secondary overflow tank, installation of an IXOM GridBee GS‑9 (or approved equal) tank mixing system, interior/exterior SSPC‑SP10 abrasive blasting and specified multi‑coat tank coating system, coating touchups, level gauge repair, O&M manual, and compliance with bonding/insurance and reference requirements. Mandatory site visit required.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableProvide construction of green stormwater infrastructure (GSI) and water distribution system improvements.
Posted Date
Nov 21, 2025
Due Date
Jan 9, 2026
Release: Nov 21, 2025
Close: Jan 9, 2026
Provide construction of green stormwater infrastructure (GSI) and water distribution system improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis