Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
GBRK Edgewood, LLC
Construction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
East Hays County Municipal Utility District No. 2
Scope of Work of the Contract Documents includes the following: Water piping, including 8" and 16" PVC pipe and appurtenances; Gravity wastewater piping consisting of 8" and 12" PVC pipe, manholes, and appurtenances; Drainage piping, including approximately 18"-60" RCP, inlets, manholes, headwalls and appurtenances; Excavation, embankment, and paving; Detention ponds, outfall structures, grading and revegetation; Sedimentation and erosion control; and Various other site improvements.
Posted Date
Nov 12, 2025
Due Date
Dec 16, 2025
Release: Nov 12, 2025
East Hays County Municipal Utility District No. 2
Close: Dec 16, 2025
Scope of Work of the Contract Documents includes the following: Water piping, including 8" and 16" PVC pipe and appurtenances; Gravity wastewater piping consisting of 8" and 12" PVC pipe, manholes, and appurtenances; Drainage piping, including approximately 18"-60" RCP, inlets, manholes, headwalls and appurtenances; Excavation, embankment, and paving; Detention ponds, outfall structures, grading and revegetation; Sedimentation and erosion control; and Various other site improvements.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Garland
Work includes paving, water, wastewater & drainage improvements. Approx. 1,700 LF Water 8" DR-18 PVC Furnish & Install; 7,500 SY Conc Paving Saw Remove & Dispose; 2,320 CY Excavation Uncl. Roadway; 2,100 SY sodding; 1,600 SY Sidewalk 4" Class "C" Construct; 1,500 LF Wastewater 8" PVC SDR-26 ASTM D3034 Furnish and Install;
Posted Date
Nov 25, 2025
Due Date
Dec 23, 2025
Release: Nov 25, 2025
City of Garland
Close: Dec 23, 2025
Work includes paving, water, wastewater & drainage improvements. Approx. 1,700 LF Water 8" DR-18 PVC Furnish & Install; 7,500 SY Conc Paving Saw Remove & Dispose; 2,320 CY Excavation Uncl. Roadway; 2,100 SY sodding; 1,600 SY Sidewalk 4" Class "C" Construct; 1,500 LF Wastewater 8" PVC SDR-26 ASTM D3034 Furnish and Install;
AvailableFort Bend County MUD No. 255
Construction of Water, Sewer, and Drainage Improvements With Paving.
Posted Date
Nov 25, 2025
Due Date
Dec 4, 2025
Release: Nov 25, 2025
Fort Bend County MUD No. 255
Close: Dec 4, 2025
Construction of Water, Sewer, and Drainage Improvements With Paving.
AvailableCity of Marlin
The City of Marlin is soliciting bids for Phase 2 water quality and drainage system improvements across multiple street segments in Falls County, Texas, with a pre‑bid meeting on December 4, 2025. Bids are due December 11, 2025 at 10:00 AM CST.
Posted Date
-
Due Date
Dec 11, 2025
City of Marlin
Close: Dec 11, 2025
The City of Marlin is soliciting bids for Phase 2 water quality and drainage system improvements across multiple street segments in Falls County, Texas, with a pre‑bid meeting on December 4, 2025. Bids are due December 11, 2025 at 10:00 AM CST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →