Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Becker seeks a contractor for cleaning and disposal of solids from the Industrial Oxidation Ditch at its wastewater treatment facility. The project involves removing dry to semi-dry solids, transporting them to a landfill, and ensuring no damage to the facility. The contractor is responsible for all disposal costs and must provide necessary equipment and insurance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes oxidation ditch remediation, pressure wash interior and exterior walls, and basin slab floor, remove and replace all interior and exterior expansion joint filler and sealer materials, seal the minor and major cracks in the concrete basin walls, clean and repair all concrete spalling on basin walls, oxidation ditch mechanical improvements, remove existing mechanical aerators and replace with new equipment, remove existing effluent weir gate and replace with new equipment.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Work includes oxidation ditch remediation, pressure wash interior and exterior walls, and basin slab floor, remove and replace all interior and exterior expansion joint filler and sealer materials, seal the minor and major cracks in the concrete basin walls, clean and repair all concrete spalling on basin walls, oxidation ditch mechanical improvements, remove existing mechanical aerators and replace with new equipment, remove existing effluent weir gate and replace with new equipment.
Premium
Access the largest public sector contact database
Diesel Particulate Filter (DPF) & Diesel Oxidation Catalyst Cleaning Services (DOC).
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Close: Dec 19, 2025
Diesel Particulate Filter (DPF) & Diesel Oxidation Catalyst Cleaning Services (DOC).
AvailableThe Village of Estero seeks bids for ditch and swale cleaning and maintenance services at multiple locations, including mowing, vegetation removal, sediment control, and erosion/pollution prevention measures. The contract is expected to start April 1, 2026 for one year with three optional one-year renewals.
Posted Date
Nov 3, 2025
Due Date
Dec 15, 2025
Release: Nov 3, 2025
Close: Dec 15, 2025
The Village of Estero seeks bids for ditch and swale cleaning and maintenance services at multiple locations, including mowing, vegetation removal, sediment control, and erosion/pollution prevention measures. The contract is expected to start April 1, 2026 for one year with three optional one-year renewals.
AvailableThe Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required for the excavation of deposited sediment in approximately 3,200 LF of drainage ditch. The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required to construct the Work along and within the existing drainage ditch. The Work includes, but is not limited to, mobilization and demobilization; control of water to perform work; furnishing, installing, and maintaining erosion control measures, site preparation including clearing and grubbing, ditch excavation and final grading, installing one culvert, and two riprap aprons.
Posted Date
Dec 5, 2025
Due Date
Dec 23, 2025
Release: Dec 5, 2025
Close: Dec 23, 2025
The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required for the excavation of deposited sediment in approximately 3,200 LF of drainage ditch. The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required to construct the Work along and within the existing drainage ditch. The Work includes, but is not limited to, mobilization and demobilization; control of water to perform work; furnishing, installing, and maintaining erosion control measures, site preparation including clearing and grubbing, ditch excavation and final grading, installing one culvert, and two riprap aprons.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis