Mississippi Department of Transportation
State AgencyMS
Posted
Oct 1, 2026
Oct 27, 2026
IM-0059-01(128) - I-59 from 0.5 mile north of McNeil Exit to south of MS 26 - Mill & Overlay RFP
Mill & Overlay. Project Length: 13.720 miles
Description: Fog Seal. Project Length: 8.286 miles.
StateAgency · MS, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Mississippi Department of Transportation.
Adjacent opportunities open for bidding right now.
Mississippi Department of Transportation
State AgencyMS
Posted
Oct 1, 2026
Oct 27, 2026
Mill & Overlay. Project Length: 13.720 miles
Mississippi Department of Transportation
State AgencyMS
Posted
Apr 3, 2026
Oct 27, 2026
Work includes random clearing 711 station, removal of asphalt paved shoulders, all depths 1380 SY, removal of guard rail 2775 LF, removal of guard rail cable anchor 4 EA, fine milling of bituminous pavement, all depths 202,706 SY, expansion joints, with dowels 24 LF, saw cut, longitudinal joints 24 LF, saw cut, full depth 3,129 LF, tie bars, no 5 deformed drilled and epoxied or grouted 6 EA, 1" smooth dowel bars, drilled & epoxied or grouted 12 EA, guard rail, class a, type 1, 'w' beam, metal post 2213 LF, temporary traffic stripe, continuous white 26 mile, temporary traffic stripe, continuous yellow 26 mile, delineators, guard rail, white 28 EA. See attached file.
Montana Department of Transportation
State AgencyMT
Posted
Oct 16, 2026
Nov 12, 2026
The project procures mastic crack filling, seal and cover, updated signing, and pavement markings. Work is on Secondary Highway Route 284 in Broadwater County, beginning at RP 16.019 and extending 26.6 miles south to RP 42.569. The work is to be completed within 40 working days, with the Notice to Proceed scheduled to take effect May 31, 2027.
Mississippi Department of Transportation
State AgencyMS
Posted
-
Oct 27, 2026
Open-Graded Friction Course (OGFC) Lift. Project Length: 3.983 miles.