Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Illinois Toll Highway Authority (THA) is issuing an amendment (Extra Work Order #33) to its contract with F.H. Paschen, S.N. Nielsen to provide a Wellpoint Dewatering System (Location 3) for the IL-390 and I-490 interchange roadway and bridge construction. The amendment adds $185,004.42 in extra work to an original contract award of $184,253,944.05. The solicitation is posted on the Illinois BidBuy portal and is listed as OPEN with responses due around the bid opening date.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct Bridge 87J74 (replaces Bridge 87560).
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
Construct Bridge 87J74 (replaces Bridge 87560).
AvailableThe Illinois Toll Highway Authority (THA) intends to amend its contract with K-Five Construction Corporation for partial depth bridge deck repairs on I-294 BN 391 & 392 as part of systemwide pavement repairs; the change order is germane to the original contract. The original contract award was $7,703,649.59 and this extra work order/change order totals $198,905.80. Bidding/response period is open (available 2026-01-15) with responses due by 2026-02-06 00:00:00Z.
Posted Date
Jan 15, 2026
Due Date
Feb 6, 2026
Release: Jan 15, 2026
Close: Feb 6, 2026
The Illinois Toll Highway Authority (THA) intends to amend its contract with K-Five Construction Corporation for partial depth bridge deck repairs on I-294 BN 391 & 392 as part of systemwide pavement repairs; the change order is germane to the original contract. The original contract award was $7,703,649.59 and this extra work order/change order totals $198,905.80. Bidding/response period is open (available 2026-01-15) with responses due by 2026-02-06 00:00:00Z.
AvailableApprox 192 CY Remove existing bridge, structural concrete (3b52); 59,710 lbs reinforcement bars; 6101 SF bridge slab concrete (3yhpc-m); 864 ft prestressed concrete beams (27m); 1440 ft steel h-piling (12 ); 510 CY riprap (cl 3); 1199 CY granular embankment; 450 CY aggregate base (cl 5); 283 TN bituminous wear course; etc.
Posted Date
Jan 15, 2026
Due Date
Feb 10, 2026
Release: Jan 15, 2026
Close: Feb 10, 2026
Approx 192 CY Remove existing bridge, structural concrete (3b52); 59,710 lbs reinforcement bars; 6101 SF bridge slab concrete (3yhpc-m); 864 ft prestressed concrete beams (27m); 1440 ft steel h-piling (12 ); 510 CY riprap (cl 3); 1199 CY granular embankment; 450 CY aggregate base (cl 5); 283 TN bituminous wear course; etc.
AvailableConstruct proposed control building.
Posted Date
Dec 9, 2025
Due Date
Feb 6, 2026
Release: Dec 9, 2025
Close: Feb 6, 2026
Construct proposed control building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →