Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes the following Work: approx. 3,620 LF of wastewater pipe to be upsized by bursting from 10" to 12", 70 LF of new 15" wastewater pipe by bore with steel casing, and 715 LF of new 15" wastewater PVC pipe by open cut to be tied into an existing 36" gravity main. Corresponding manhole upgrades and surface repairs are also included in the scope of work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes the rehabilitation of existing sanitary sewer lines through pipe bursting methods, replacement of sanitary sewer service laterals, and rehabilitation of sewer manholes. Work includes, 175 SY of pavement repair (hmac type d) 2" & flowable; 120 LF of trench excavation safety protection; 665 LF of sewer main television inspection (8" - 15"); 665 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting; 1,120 LF of sewer main television inspection (8" - 15"); 1,120 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting. See attached files.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The project includes the rehabilitation of existing sanitary sewer lines through pipe bursting methods, replacement of sanitary sewer service laterals, and rehabilitation of sewer manholes. Work includes, 175 SY of pavement repair (hmac type d) 2" & flowable; 120 LF of trench excavation safety protection; 665 LF of sewer main television inspection (8" - 15"); 665 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting; 1,120 LF of sewer main television inspection (8" - 15"); 1,120 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting. See attached files.
Premium
Access the largest public sector contact database
The City of Moriarty issued an emergency contract to perform pipe bursting and asphalt restoration to repair a failed sewer line and prevent sewage backups and environmental/health risks. The work includes directional drilling, pipe bursting of an 8" SAS line, CCTV/cleaning, restoring affected services, removing and replacing asphalt patches, and paving the trench.
Posted Date
-
Due Date
Dec 13, 2025
Close: Dec 13, 2025
The City of Moriarty issued an emergency contract to perform pipe bursting and asphalt restoration to repair a failed sewer line and prevent sewage backups and environmental/health risks. The work includes directional drilling, pipe bursting of an 8" SAS line, CCTV/cleaning, restoring affected services, removing and replacing asphalt patches, and paving the trench.
AvailableWork includes installation of new gravity sanitary sewer piping including customer services laterals, new low pressure sanitary sewer piping including customer services laterals, bypass pumping, restoration of disturbed areas, sanitary sewer pipe stream crossing and erosion and sediment control.
Posted Date
Sep 12, 2025
Due Date
Dec 17, 2025
Release: Sep 12, 2025
Close: Dec 17, 2025
Work includes installation of new gravity sanitary sewer piping including customer services laterals, new low pressure sanitary sewer piping including customer services laterals, bypass pumping, restoration of disturbed areas, sanitary sewer pipe stream crossing and erosion and sediment control.
AvailableProject generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis