Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Troy
The project consists of installing an approved potable water tank active mixing system capable of completely mixing the 1,000,000 gallon highway elevated water storage tank and the 500,000 gallon street elevated water storage tank. The mixing system is to include telemetry and SCADA control.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Orangeburg Department of Public Utilities
Prep, Clean, Containment, Blast Interior and Exterior, Paint/Finish the Interior and Exterior Surfaces of the Tank (including concrete base), Painting Exposed Piping, and Miscellaneous Repairs/Tasks at the Whaley Street Tank (250,000 Gallons) and St. Matthews Tank (250,000 Gallons) as indicated or specified and as needed for a complete and proper installation.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Orangeburg Department of Public Utilities
Close: Dec 18, 2025
Prep, Clean, Containment, Blast Interior and Exterior, Paint/Finish the Interior and Exterior Surfaces of the Tank (including concrete base), Painting Exposed Piping, and Miscellaneous Repairs/Tasks at the Whaley Street Tank (250,000 Gallons) and St. Matthews Tank (250,000 Gallons) as indicated or specified and as needed for a complete and proper installation.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Waynesboro Borough (Water And Sewer) Authority
Project consists of draining, cleaning, blasting and recoating 3,500,000 million gallon steel reservoir tank interior; power wash, power tool clean, spot prime, and overcoating the tank exterior; installation of a fall protection device; coating and caulking of the concrete foundation; coating, sealing, and caulking of the exposed top, sides, and interior of the valve vault; overcoating piping within the valve vault; and miscellaneous signage.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Waynesboro Borough (Water And Sewer) Authority
Close: Dec 18, 2025
Project consists of draining, cleaning, blasting and recoating 3,500,000 million gallon steel reservoir tank interior; power wash, power tool clean, spot prime, and overcoating the tank exterior; installation of a fall protection device; coating and caulking of the concrete foundation; coating, sealing, and caulking of the exposed top, sides, and interior of the valve vault; overcoating piping within the valve vault; and miscellaneous signage.
AvailableCity of Ponder
Project consists of furnishing and installing new pump house and ground storage tank followed by decommissioning existing pump house and ground storage tank with other site civil aspects
Posted Date
Apr 10, 2025
Due Date
Apr 29, 2026
Release: Apr 10, 2025
City of Ponder
Close: Apr 29, 2026
Project consists of furnishing and installing new pump house and ground storage tank followed by decommissioning existing pump house and ground storage tank with other site civil aspects
AvailableCity of Bloomfield
The project consists of replacing the 1,000,000-gallon water storage tank known as the West Tank or Wilderness Tank.
Posted Date
Sep 9, 2025
Due Date
Dec 3, 2025
Release: Sep 9, 2025
City of Bloomfield
Close: Dec 3, 2025
The project consists of replacing the 1,000,000-gallon water storage tank known as the West Tank or Wilderness Tank.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →