Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
3 EA clearing & grubbing; 1 EA remove bollard; 270 LF remove curb & gutter; 440 LF sawing bit or concrete pavement; 1600 SY remove bituminous pavement; 90 SY remove driveway or walk; 990 CY excavation-common (EV) (P); 980 SY geotextile fabric type 4 (P); 980 CY aggregate base (CV) class 5 (P); 60 EA drill & grout reinf bar (epoxy coated); 280 gallon bituminous material for tack coat; 660 TN type sp 9. 5 and 12. 5 wear course mix; 4000 SF 6" concrete walk; 230 LF concrete curb & gutter, design b618; 28 SY 8" concrete driveway pavement; 88 SF truncated domes; 49 SF sign panels type c; 500 LF 4" solid line multi-component; 280 SF crosswalk multi-component ground in; 2 EA remove drainage structure; 1 EA remove box culvert end section; 100 LF remove pipe sewer or culvert; 1 EA 6x4 precast concrete box culvert end section; 8 LF 6x4 precast concrete box culvert; 8 LF 28" span rc pipe; 101 LF 18-24" storm sewer; 3 EA connect to inplace culvert or storm sewer; 55 CY random riprap Class III; see outside link for details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Coalition for the Upper South Platte (CUSP) is soliciting bids to construct trailhead improvements at the Marksbury Gulch area in Colorado via the Rocky Mountain E‑Purchasing System. The project encompasses site and trailhead amenities and associated construction work as detailed in the bid documents on the portal. Vendors must submit by the specified deadline; the posting is an active construction solicitation, not a grant program.
Posted Date
Dec 9, 2025
Due Date
Dec 30, 2025
Release: Dec 9, 2025
Close: Dec 30, 2025
Coalition for the Upper South Platte (CUSP) is soliciting bids to construct trailhead improvements at the Marksbury Gulch area in Colorado via the Rocky Mountain E‑Purchasing System. The project encompasses site and trailhead amenities and associated construction work as detailed in the bid documents on the portal. Vendors must submit by the specified deadline; the posting is an active construction solicitation, not a grant program.
AvailableThe Town of Silverthorne seeks bids to replace and upgrade water and sewer infrastructure on Hummingbird Circle, including approximately 980 LF of 4-inch CIP water main upgraded to 8-inch C900, sanitary sewer manhole work, valves, service connections, and associated roadway and stormwater improvements. The project is advertised December 4, 2025, includes a mandatory pre-bid on January 7, 2026, and bids are due January 30, 2026 at 12:00 PM local time.
Posted Date
Dec 4, 2025
Due Date
Jan 30, 2026
Release: Dec 4, 2025
Close: Jan 30, 2026
The Town of Silverthorne seeks bids to replace and upgrade water and sewer infrastructure on Hummingbird Circle, including approximately 980 LF of 4-inch CIP water main upgraded to 8-inch C900, sanitary sewer manhole work, valves, service connections, and associated roadway and stormwater improvements. The project is advertised December 4, 2025, includes a mandatory pre-bid on January 7, 2026, and bids are due January 30, 2026 at 12:00 PM local time.
The Work consists of: Rehabilitation of 5 existing bridges. Replacement of 9 timber cribbing walls with mechanically stabilized earth walls. Development of Bridge 2 Overlook. Replacement of stair system at Big Rock with a combination retained earth and wood ramp structure. Replacement and installation of drainage culvert improvements, creating ditching along alignment, installing new railing at vista overlook and installation of new trail surface aggregate. Establishment of a formal trailhead with trailhead amenities at Trailhead. Rehabilitation of the Trailhead.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
The Work consists of: Rehabilitation of 5 existing bridges. Replacement of 9 timber cribbing walls with mechanically stabilized earth walls. Development of Bridge 2 Overlook. Replacement of stair system at Big Rock with a combination retained earth and wood ramp structure. Replacement and installation of drainage culvert improvements, creating ditching along alignment, installing new railing at vista overlook and installation of new trail surface aggregate. Establishment of a formal trailhead with trailhead amenities at Trailhead. Rehabilitation of the Trailhead.
Work consists of Tonquin Trail Accessibility.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
Close: Jan 8, 2026
Work consists of Tonquin Trail Accessibility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis