Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1. Exterior work includes: non-historic window replacements at the North elevation, existing window restoration/refinishing, repairing/refinishing historic concrete and cleaning/sealing limestone. 2. Interior work includes: electrical revisions at Stage 107b, window treatments at new windows, refinishing wood floor and base at Auditorium 107, refinishing historic wood doors in Auditorium 107, refinishing historic ticket booth surround in Lobby 100. 3. Alternate No. 1 work includes: refinishing wood floor and base at Stage 107b.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Phase 4 exterior renovation, Lintel Removal and Replacement, Brick Removal and Replacement, Tuck Pointing, Helical Wall Ties, Stone Replacement and Fastening Common, Stone Replacement and Fastening - Decorative Bands, Stone Replacement and Fastening - Parapet Cap, Concrete Repair -Trowel/ Overhead/ Form & Pour, Exposed Reinforcement Coating.
Posted Date
Dec 22, 2025
Due Date
Jan 23, 2026
Release: Dec 22, 2025
Close: Jan 23, 2026
Phase 4 exterior renovation, Lintel Removal and Replacement, Brick Removal and Replacement, Tuck Pointing, Helical Wall Ties, Stone Replacement and Fastening Common, Stone Replacement and Fastening - Decorative Bands, Stone Replacement and Fastening - Parapet Cap, Concrete Repair -Trowel/ Overhead/ Form & Pour, Exposed Reinforcement Coating.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Naselle hatchery renovation phase 2 project which includes the construction of an exclusion barrier weir, river intake, juvenile resident fish ladder, river intake pump station, adult fishway, auxiliary water supply, adult collection trap, adult holding ponds, reuse pump station and other incidental work at the hatchery.
Posted Date
Dec 8, 2025
Due Date
Feb 5, 2026
Release: Dec 8, 2025
Close: Feb 5, 2026
Naselle hatchery renovation phase 2 project which includes the construction of an exclusion barrier weir, river intake, juvenile resident fish ladder, river intake pump station, adult fishway, auxiliary water supply, adult collection trap, adult holding ponds, reuse pump station and other incidental work at the hatchery.
AvailablePhase 1 consists of selective building demolition including hazardous material removal, wall and ceiling assemblies, finishes, plumbing, mechanical, electrical, and fire alarm systems. The building shall remain unoccupied until phase 2 (Renovation) beneficial occupancy or final completion.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Phase 1 consists of selective building demolition including hazardous material removal, wall and ceiling assemblies, finishes, plumbing, mechanical, electrical, and fire alarm systems. The building shall remain unoccupied until phase 2 (Renovation) beneficial occupancy or final completion.
AvailablePartial renovation of first floor and third floor, full renovation of second floor, building n. No change of use or occupancy. Replacing doors and updating lab equipment are part of the scope of work. No revisions to existing life safety or exiting are proposed.
Posted Date
Nov 20, 2025
Due Date
Jan 5, 2026
Release: Nov 20, 2025
Close: Jan 5, 2026
Partial renovation of first floor and third floor, full renovation of second floor, building n. No change of use or occupancy. Replacing doors and updating lab equipment are part of the scope of work. No revisions to existing life safety or exiting are proposed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →