U.S. Army Engineer District Savannah
FederalGA
Posted
Apr 10, 2026
Oct 22, 2026
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina RFP
Construction of a standard automated infantry platoon battle course (IPBC).
Description: The Medical Acquisition Support Office – Alpha issued this sources-sought notice to identify vendors capable of providing human-cadaver-based medical training and program support for the 44th Medical Brigade at Fort Bragg, North Carolina; it is procurement market research, not a grant or an issued request for quotations. The requirement includes cadavers, medical equipment, Class VIII supplies, training, transportation and logistical support, subject-matter experts, and program administration, with an anticipated base period and four one-year options. SAM.gov's structured response field gives October 30, 2026 at 4:00 p.m. CDT as the deadline, although the notice narrative uses CST.
Federal · TX, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
U.S. Army Engineer District Savannah
FederalGA
Posted
Apr 10, 2026
Oct 22, 2026
Construction of a standard automated infantry platoon battle course (IPBC).
Posted
Oct 13, 2026
Oct 26, 2026
The project is to enclose a three-sided structure at a landfill facility. It includes a mezzanine with office space on the first floor. The second story will be open space.
Posted
Oct 13, 2026
Oct 26, 2026
This is an HVAC trade-package solicitation for a Fort Bragg landfill project. A related trade-package overview describes enclosing a three-sided structure at a landfill and adding a mezzanine, with office space on the first floor and open space on the second story. The accessible HVAC notice does not expose detailed HVAC specifications or a primary solicitation file.
FederalNC
Posted
Oct 13, 2026
Oct 26, 2026
Enclose 3 sided structure within the landfill. Add mezzanine to the right side of the structure with first floor being utilized as office space and second story being used as open space. Work includes demolition; concrete; structural steel; architectural woodwork; doors, frames & hardware; drywall & framing; flooring; painting; signage; toilet partitions & bathroom accessories; window treatment; plumbing; HVAC; electrical; earthwork.