Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacing all indoor units with new floor-mounted equipment and all three outdoor condensing units. New units will utilize building chilled water, dx, and free-cooling sources to meet energy codes, with controls to alternate between units. The current air distribution will be modified to provide adequate air flow to servers. Demolition of all existing ceiling- mounted crac units, overhead water piping and associated infrastructure. New units will be tied into the existing campus building automation system, including leak detection.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of modifications to the existing server room including removal of existing wall, ADA signage upgrades and fire sprinkler replacements.
Posted Date
Nov 22, 2025
Due Date
Jan 7, 2026
Release: Nov 22, 2025
Close: Jan 7, 2026
Project consists of modifications to the existing server room including removal of existing wall, ADA signage upgrades and fire sprinkler replacements.
AvailableIssue project room interior fit out - HVAC work and fire safety work.
Posted Date
Dec 5, 2025
Due Date
Jan 12, 2026
Release: Dec 5, 2025
Close: Jan 12, 2026
Issue project room interior fit out - HVAC work and fire safety work.
AvailableDemo/Removal: a. Contractor shall perform Lock Out/Tag Out (LO/TO) procedures prior to starting any HVAC repair work that involves electrical circuits. Coordinate any required outages with Navy Lodge On-Site POC, Connie Butler, and keep the NEXCOM Project Manager (PM), Christopher Wahl, informed of the outage schedule(s) as applicable. b. Contractor shall disconnect power and any necessary refrigerant lines, electrical components, or ducting required to access and replace the failed parts within the HVAC unit. c. Contractor shall remove and properly dispose of any failed HVAC components. All disposals shall adhere to Section C, Codes and Regulations. d. Contractor shall be responsible for any repairs to wall finishes, flooring, ceilings, and entrances damaged as a result of the component removal and replacement. See attached file.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Replacement of the HVAC system. Work include remove and replace the existing non-functioning 12.5-ton gas HVAC unit, Furnish and install one (1) 12.5-ton gas packaged unit with economizer (including crane service), furnish and install one (1) new fused safety disconnect with new fuses, fabricate and install a new curb adaptor, furnish and install one (1) new gas flex with a safety shut-off valve, furnish and install necessary condensate piping to the nearest roof drain. See attached file
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Replacement of the HVAC system. Work include remove and replace the existing non-functioning 12.5-ton gas HVAC unit, Furnish and install one (1) 12.5-ton gas packaged unit with economizer (including crane service), furnish and install one (1) new fused safety disconnect with new fuses, fabricate and install a new curb adaptor, furnish and install one (1) new gas flex with a safety shut-off valve, furnish and install necessary condensate piping to the nearest roof drain. See attached file
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demo/Removal: a. Contractor shall perform Lock Out/Tag Out (LO/TO) procedures prior to starting any HVAC repair work that involves electrical circuits. Coordinate any required outages with Navy Lodge On-Site POC, Connie Butler, and keep the NEXCOM Project Manager (PM), Christopher Wahl, informed of the outage schedule(s) as applicable. b. Contractor shall disconnect power and any necessary refrigerant lines, electrical components, or ducting required to access and replace the failed parts within the HVAC unit. c. Contractor shall remove and properly dispose of any failed HVAC components. All disposals shall adhere to Section C, Codes and Regulations. d. Contractor shall be responsible for any repairs to wall finishes, flooring, ceilings, and entrances damaged as a result of the component removal and replacement. See attached file.
Available