Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide structural ceiling suspension system. This suspension system shall include the attachment to overhead concrete slab/concrete metal deck slab assembly, steel angle, plate hanger, and running (carrying) channels. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Ceiling & lighting replacement - future ready center.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Ceiling & lighting replacement - future ready center.
AvailablePremium
Access the largest public sector contact database
Scope of work will consist of renovations and modernization of existing project and includes remove existing 1 x1" fiberboard style ceiling tile throughout units. Existing 1x4 wood furring strips attached to ceiling shall remain. Fasteners from existing ceiling tiles shall be fully removed or fully nailed/screwed in to 1x4s. Provide new 1/2" gypsum board ceiling attached to existing 1x4 furring strips. Provide a level 4 finish. Remove existing ceiling mounted lights. Salvage any tenant installed fans for reinstallation. Upon installation of new gyp. bd. ceiling, provide new LED light fixtures. See attached files.
Posted Date
Oct 10, 2025
Due Date
Dec 18, 2025
Release: Oct 10, 2025
Close: Dec 18, 2025
Scope of work will consist of renovations and modernization of existing project and includes remove existing 1 x1" fiberboard style ceiling tile throughout units. Existing 1x4 wood furring strips attached to ceiling shall remain. Fasteners from existing ceiling tiles shall be fully removed or fully nailed/screwed in to 1x4s. Provide new 1/2" gypsum board ceiling attached to existing 1x4 furring strips. Provide a level 4 finish. Remove existing ceiling mounted lights. Salvage any tenant installed fans for reinstallation. Upon installation of new gyp. bd. ceiling, provide new LED light fixtures. See attached files.
AvailableAcoustic ceiling systems.
Posted Date
Nov 22, 2025
Due Date
Dec 17, 2025
Release: Nov 22, 2025
Close: Dec 17, 2025
Acoustic ceiling systems.
AvailableProject includes permanent, fix-message signage with related products and services to result in a procurement solution for use by its participating entities.
Posted Date
Nov 4, 2025
Due Date
Dec 23, 2025
Release: Nov 4, 2025
Close: Dec 23, 2025
Project includes permanent, fix-message signage with related products and services to result in a procurement solution for use by its participating entities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis