Retrieving RFP details
Release
Close
Mustang Special Utility District
Work includes construction of a new pre-cast concrete vault, by-pass pipeline, demolition existing prv vault, salvaging and relocating existing prv to the new vault.
Town of West Rutland
The Project consists of the installation of a pressure reducing vault and appurtenances necessary to connect to the existing water infrastructure in the area.
City of Aurora
Provide materials and labor for the east well collector combination pressure reducing & pressure sustaining valve replacement for the water treatment plant. The work includes the removal of an existing 12 inch combination pressure reducing and pressure sustaining valve for a well collector pipe within the existing City. Water Treatment Plant; providing and installing a new 12" combination pressure reducing and pressure sustaining valve; removal of existing adjoining well collector piping and fittings; providing and installing new adjoining well collector piping and fittings; removal of existing appurtenances; providing and installing new appurtenances
City of Ozark
The project consists of the replacement of two (2) pressure reducing valves and the top slab at the helburg valve vault and the replacement of all interior mechanical fittings, interior mechanical equipment, and the top slab at the east tank/butterball tank control valve vault.
Release
-
Close
Nov 13, 2025