Summary
Work includes 6,600 LF installation and removal of silt fence; 42 EA inlet protection; 8 ac temporary seeding and mulching; 31,460 SY concrete removal (12" to 18"); 9,240 SY asphalt/concrete removal (4" ac/12-16" pcc); 118,800 SY asphalt/concrete removal (8" - 18" ac/6" -20" pcc); 13,750 SY asphalt removal (6" ac on stabilized base); 9,790 SY asphalt/concrete removal (5" ac/27" pcc); 36,850 SY asphalt removal (8- 12" ac); 6,160 SY asphalt milling (3"); 3,190 SY asphalt removal (4" ac/26" cabc); ; 1,100 SY asphalt roadway removal (2" - 4" ac); 6,930 SY existing drainage pipe removal (all diameters). See attached file.