Indiana Department of Transportation
State AgencyIN
Posted
Nov 11, 2026
Dec 9, 2026
ST 2369 HMA Overlay, Preventive Maintenance RFP
Work includes 4,078 LF of curb and gutter removal; 318 CY of common excavation; 59,330 SY of milling, asphalt, 1 1/2 in. ; 27,114 LF of joint adhesive; 27,114 LF of void reducing asphalt membrane for hma; 458 SY of pccp patching, full depth; 1,456 SF of joint repair, partial depth; 2,613 LF of guardrail removal; 625 LF of guardrail, wr-beam; 725 LF of guardrail, mgs w-beam, 6 ft 3 in. Spacing; 1,145 SY of sidewalk, concrete, reconstruct. See attached file.
