Retrieving RFP details
Release
Close
City of Farmington
Work includes sidewalk improvements and provides for concrete sidewalks and ADA ramps, concrete approach, concrete curb and gutter, storm sewer improvements, pavement striping, traffic control and other incidental items and work.
Farmington - Hwy H Sidewalks - TAP-2500(008) - Invitation for Bids Posting
City of Phoenix
Work to be performed includes, but is not necessarily limited to: remove existing striping and signage, and install new striping and relocate signage; install sidewalks, including driveway and pedestrian ramps, and associated storm drain piping; reinstall existing structures and utilities; perform traffic control; and conduct construction surveying. Work includes, 550 LF of striping removal; 1,000 LF of asphalt pavement saw cutting; 689 SY of removal of surfacings; 820 LF of 12" storm sewer pipe with class B backfill; 2,610 SF of concrete driveways; 4,000 SF of concrete walks; 2,000 LF of longitudinal pavement markings - paint; 13 SY of removal of walks and driveways; 26 ton of level 2, 1/2" acp mixture. See outside link.
City of Pasadena
Sidewalk Improvements.
City of Roscoe
Provide replacement of up to 4 blocks of existing sidewalk including demo and removal of existing surface, replacement of sidewalk, lighting, and incidentals.
New York State Department of Transportation
Design, highway lighting study and improvements.
Release
Oct 01, 2024
Close
Nov 05, 2024