Retrieving RFP details
Release
Close
Village of Mount Kisco
Work includes the installation of 510 LF of 8" class 54 DIP water main with pressure class 350 mechanical joint fittings and thrust blocks, fire hydrants, water service connections; 720 LF of 8"class 54 DIP sewer main and resurfacing of roadway; clean and restore the site.
Borough of Mount Penn
Installation of approx. 760 LF of 8" ductile iron water main, 110 LF of 4" ductile iron water main, appurtenances, and reconnection of approx. 13 existing water services
Leacock Township Municipal Authority
Project generally comprises the installation of approx. 1,675 LF of 8" D.I. water main, seven gate valves, four hydrant assemblies, twenty-eight water service connections, and restoration to paved areas disturbed by construction operations. It also contains an Alternative comprising of additional 555 LF of 8" D.I. water main, one gate valve, one hydrant assembly, nine water service connections, and restoration to paved areas disturbed by construction operations.
City of Chino Hills
Work consists Installation of a new 12" PVC C900 DR 14 water main and all associated tasks including trenching; new fire hydrant installation; new water service lateral installation; removal of interfering portions of existing water main infrastructure; backfill and compaction; flushing, disinfection, and testing; asphalt reconstruction; sidewalk and driveway construction; fence and gate replacement; private property restoration; striping restoration; monument preservation.
Release
Oct 27, 2025
Close
Nov 24, 2025