Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include sewage pumping when required; track time flagging fees; furnish and install manhole san-01 and piping up to SAN-02; furnish and install SAN-02, 15" dip piping, 24" steel casing up to and including SAN-03. bore and Jack the casing pipe under main line railroad; Furnish and install piping and remaining manholes from SAN-03 up to the existing manhole SAN-06; repair and repave the existing drive if required; miscellaneous clean-up activities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Premium
Access the largest public sector contact database
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
AvailableWork including. 1,918 LF of 10” SDR 35 PVC sewer line with associated appurtenances. 102 LF 14" steel encasement, 100 LF 14" bore, 90 LF 8'-10' trenching, 3 EA 6' Dia. new manhole, 4 EA cap and abandon existing sewer line, 0.71 AC clearing & grubbing, 5 LF curb and gutter repair, 69 LF asphalt pavement repair, 42 LF fence repair, 35 LF 24" RCP storm sewer pipe, 1,850 LF 8" grout existing sewer line.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
Work including. 1,918 LF of 10” SDR 35 PVC sewer line with associated appurtenances. 102 LF 14" steel encasement, 100 LF 14" bore, 90 LF 8'-10' trenching, 3 EA 6' Dia. new manhole, 4 EA cap and abandon existing sewer line, 0.71 AC clearing & grubbing, 5 LF curb and gutter repair, 69 LF asphalt pavement repair, 42 LF fence repair, 35 LF 24" RCP storm sewer pipe, 1,850 LF 8" grout existing sewer line.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis