Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase of drainage tile for calendar year 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project will upgrade a portion of the existing drainage system. There will be approx. 130' of 24" pipe installed and 5 new drainage structures constructed. Also, a new ez-block retaining wall will be constructed to support the existing failing stone wall on street. A portion of the existing driveway will be repaved and new curbing will be installed. Modified riprap will be installed on the slope and grass will be established on disturbed areas. See outside link.
Posted Date
Nov 14, 2025
Due Date
Jan 14, 2026
Release: Nov 14, 2025
Close: Jan 14, 2026
This project will upgrade a portion of the existing drainage system. There will be approx. 130' of 24" pipe installed and 5 new drainage structures constructed. Also, a new ez-block retaining wall will be constructed to support the existing failing stone wall on street. A portion of the existing driveway will be repaved and new curbing will be installed. Modified riprap will be installed on the slope and grass will be established on disturbed areas. See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design/build services for trail drainage improvement project.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/build services for trail drainage improvement project.
AvailableTarrant County College District (TCCD) issued RFP #25-044 for foundation drainage and site improvements at the ESCT building on TCCD’s Southeast campus in Arlington, TX. The scope includes soil stabilization to mitigate soil movement/expansion and crawl space upgrades (removal/replacement/installation of insulation and intake/exhaust systems), with architectural drawings and engineering manuals provided as appendices. The solicitation is posted on TCCD’s Bonfire portal, is an RFP (not a grant), and is open with questions due in early January 2026 and final submissions due Jan 16, 2026.
Posted Date
Dec 15, 2025
Due Date
Jan 16, 2026
Release: Dec 15, 2025
Close: Jan 16, 2026
Tarrant County College District (TCCD) issued RFP #25-044 for foundation drainage and site improvements at the ESCT building on TCCD’s Southeast campus in Arlington, TX. The scope includes soil stabilization to mitigate soil movement/expansion and crawl space upgrades (removal/replacement/installation of insulation and intake/exhaust systems), with architectural drawings and engineering manuals provided as appendices. The solicitation is posted on TCCD’s Bonfire portal, is an RFP (not a grant), and is open with questions due in early January 2026 and final submissions due Jan 16, 2026.
AvailableThis RFP is for labor, materials, machinery, tools, and equipment for the Briarview Road Drainage Improvements project, including a new closed drainage system with concrete curb and gutter.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
This RFP is for labor, materials, machinery, tools, and equipment for the Briarview Road Drainage Improvements project, including a new closed drainage system with concrete curb and gutter.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →