Summary
The City of Oregon City is seeking sealed bids for the construction of the Henrici Water Pump Station and Transmission Improvements WIFIA 3-2 (CI 24-004), a project to strengthen the city's upper water system south of Mountain View Street by replacing outdated and undersized facilities with new right-sized ones. The work includes constructing approximately 7,050 linear feet of new 24-inch ductile iron transmission main along Beavercreek Road and Henrici Road, approximately 290 linear feet of new 16-inch ductile iron transmission main connecting the proposed Henrici Pump Station to the existing Henrici Reservoir, and a new 4.48 MGD pump station with five pumps, bladder tank, chlorination system, hoist system, instrumentation, controls, electrical, and generator. A mandatory pre-bid meeting is scheduled for July 13, 2026, at the Henrici Reservoir site, and the project is partially funded through a U.S. EPA WIFIA loan requiring federal compliance including Davis-Bacon prevailing wage rates.