Summary
Concrete construction construct a 50’ × 50’ × 6” helipad slab using 4,000 psi concrete. Include a 12’ × 12’ mono perimeter footer with continuous 2 × #5 rebar and 6"×6" heavy-gauge (6-gauge) wire mesh with fiber reinforcement. Construct a 34’ × 10’ walkway slab; final thickness to be confirmed by county prior to construction based on site verification (note: prior references indicated both 4" and 6"). Boom pump may be used; boom must be properly flagged. Component b — electrical & lighting replace 16 outer pad marking lights, 4 pad marker lights, and 4 centerline spotlights. Install red elevated perimeter lights (14” height) with base plates and underground junction boxes; install semi-flush red marking lights and semi-flush white spotlights set in the concrete pad. Replace/install all wiring, conduit, and waterproof junction boxes starting from existing switches; provide bluetooth/wi-fi remote switching with handheld remote and smartphone access.