Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Village of Long Grove
Installation of approx., 1,500 LF of 12" ductile iron water main constructed by both open-cut and trenchless methods. The work also includes the installation of a steel casing pipe beneath aptakisic road by jacking and boring methods. Major work items include, but are not limited to, the installation of approximately 1,500 LF of 12" ductile iron water main, steel casing pipe, fire hydrants, valve vaults, trench backfill, pavement patching, and site restoration.
Village of Lakewood
Installation of approximately 4,700 LF of 16-inch water main, including fire hydrants, valves in vaults, and a flushing and sampling station; including parkway restoration and driveway replacement; and other miscellaneous items of work.
Henderson Nina Water System Inc
Work includes Construction of approx. 19,500 LF of water main, 9,000 LF of 4" water main, 10,000 LF of 3" water main, flushing hydrants, valves, meters and other appurtenant and related items of construction.