Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Work of this Contract is generally described as rehabilitation of Septage Receiving Station (Structure 012) Hauled-In Waste Tank. Significant corrosion on the inside of the tank requires cleaning and coating. The tank consists of two waste receiving pumps and PVC piping to be salvaged for reinstallation. Three Post-ATAD blowers are located on the cover of Structure 012 which will be relocated. A new tank cover is required due to the extent of corrosion. The Hauled-In Waste Tank will be tied into the existing odor control system with vent and odorous air duct with dampers. The project includes site work, structural, process piping and equipment relocation, ventilation, electrical, and instrumentation and control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Bristol Warren Regional School District (for work at the Town of Warren Wastewater Treatment Facility) solicits sealed proposals for demolition, removal, disposal, and replacement of an existing sodium hypochlorite bulk storage tank and associated piping. The contractor must furnish and install one new 905-gallon sodium hypochlorite bulk storage tank, reconnect and replace piping components as needed, perform leak and system testing, coordinate startup with facility personnel, and place the system into full operational service. The posting was issued 2026-01-15 with a response deadline of 2026-01-29 and is a single solicitation (not a grant).
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
The Bristol Warren Regional School District (for work at the Town of Warren Wastewater Treatment Facility) solicits sealed proposals for demolition, removal, disposal, and replacement of an existing sodium hypochlorite bulk storage tank and associated piping. The contractor must furnish and install one new 905-gallon sodium hypochlorite bulk storage tank, reconnect and replace piping components as needed, perform leak and system testing, coordinate startup with facility personnel, and place the system into full operational service. The posting was issued 2026-01-15 with a response deadline of 2026-01-29 and is a single solicitation (not a grant).
AvailableThe Town of Bolton, Vermont is soliciting bids for construction to upgrade the Bolton Valley Community Water and Sewer wastewater treatment facility. The project includes new headworks and pump station, a pre‑equalization tank, a new SBR system, an operations building with filtration and UV disinfection, chemical storage and feed systems, laboratory and office space, and demolition of existing structures. Bidding documents are made available via the engineer’s bid portal (Hoyle Tanner) through QuestCDN, and bids are due March 5, 2026.
Posted Date
Jan 19, 2026
Due Date
Mar 5, 2026
Release: Jan 19, 2026
Close: Mar 5, 2026
The Town of Bolton, Vermont is soliciting bids for construction to upgrade the Bolton Valley Community Water and Sewer wastewater treatment facility. The project includes new headworks and pump station, a pre‑equalization tank, a new SBR system, an operations building with filtration and UV disinfection, chemical storage and feed systems, laboratory and office space, and demolition of existing structures. Bidding documents are made available via the engineer’s bid portal (Hoyle Tanner) through QuestCDN, and bids are due March 5, 2026.
Nitrogen Reduction Upgrades Wastewater Treatment Facility
Posted Date
Dec 1, 2025
Due Date
Feb 18, 2026
Release: Dec 1, 2025
Close: Feb 18, 2026
Nitrogen Reduction Upgrades Wastewater Treatment Facility
AvailableNitrogen Reduction Upgrades Wastewater Treatment Facility
Posted Date
Dec 1, 2025
Due Date
Feb 18, 2026
Release: Dec 1, 2025
Close: Feb 18, 2026
Nitrogen Reduction Upgrades Wastewater Treatment Facility
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis