Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Bolton, Vermont is soliciting bids for construction to upgrade the Bolton Valley Community Water and Sewer wastewater treatment facility. The project includes new headworks and pump station, a pre‑equalization tank, a new SBR system, an operations building with filtration and UV disinfection, chemical storage and feed systems, laboratory and office space, and demolition of existing structures. Bidding documents are made available via the engineer’s bid portal (Hoyle Tanner) through QuestCDN, and bids are due March 5, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 1 LS Furnish and install allfacilities of the BVCWS WWTF, complete, in place for all work except the work to be provided under Bid Items A-2 through A-8; 10 CY Furnish, form and place concreteas required or directed by the Engineer, complete, in place at the unit price per Cubic Yard of; 10 CY For roadways, site grading, grading or structures, complete, including drilling, removal, disposal refill, labor equipment, materials and incidental work at the unit price per Cubic Yard of; 10 CY For yard piping, complete including drilling, removal, disposal, refill and for all labor, equipment, materials and incidental work,
Posted Date
Jan 16, 2026
Due Date
Mar 5, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Mar 5, 2026
Work includes approx 1 LS Furnish and install allfacilities of the BVCWS WWTF, complete, in place for all work except the work to be provided under Bid Items A-2 through A-8; 10 CY Furnish, form and place concreteas required or directed by the Engineer, complete, in place at the unit price per Cubic Yard of; 10 CY For roadways, site grading, grading or structures, complete, including drilling, removal, disposal refill, labor equipment, materials and incidental work at the unit price per Cubic Yard of; 10 CY For yard piping, complete including drilling, removal, disposal, refill and for all labor, equipment, materials and incidental work,
AvailableProcurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableProcurement of construction and installation services for Sanitary Sewer System Improvements, including video inspection, CIPP, pipebursting, and manhole rehabilitation, and for Wastewater Treatment Facility Improvements, encompassing mechanical and biofiltration systems, UV disinfection, sludge de-watering, lift station rehabilitation, generator, electrical controls, and sludge retention basin construction.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction and installation services for Sanitary Sewer System Improvements, including video inspection, CIPP, pipebursting, and manhole rehabilitation, and for Wastewater Treatment Facility Improvements, encompassing mechanical and biofiltration systems, UV disinfection, sludge de-watering, lift station rehabilitation, generator, electrical controls, and sludge retention basin construction.
AvailableWork includes construction of a new wastewater treatment facility. The wastewater treatment facility will be a 15,000 gallon per day mini MBR. The project also includes influent and effluent piping, electrical site work, civil site work, and removal of an existing, abandoned wastewater treatment plant. Approx. 60 LF of 6" PVC sewer line; 279 LF Fencing; 4 Ea Sewer manhole;
Posted Date
Dec 16, 2025
Due Date
Feb 19, 2026
Release: Dec 16, 2025
Close: Feb 19, 2026
Work includes construction of a new wastewater treatment facility. The wastewater treatment facility will be a 15,000 gallon per day mini MBR. The project also includes influent and effluent piping, electrical site work, civil site work, and removal of an existing, abandoned wastewater treatment plant. Approx. 60 LF of 6" PVC sewer line; 279 LF Fencing; 4 Ea Sewer manhole;