Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide WWTP air header replacement. Project consists of removing and replacing approx. 215 LF of existing 18" ductile iron pipe, fittings and appurtenances on an existing wastewater treatment plant air blower system, along with approx. 20 LF of 12" ductile iron pipe, fittings and two 12" butterfly valves. Contractor shall also restore concrete pavement disturbed by construction, expand existing concrete driveway, and recoat existing ductile iron pipe air header.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacing an existing kewanee m- 235-gg hot water boiler, provide new boiler to meet or exceed current kewanee m-235-gg hw boiler.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Replacing an existing kewanee m- 235-gg hot water boiler, provide new boiler to meet or exceed current kewanee m-235-gg hw boiler.
AvailablePremium
Access the largest public sector contact database
Provide air compressor removal and replacement. Furnish, deliver, and install one (1) air compressors. Work shall also include the removal and disposal of the existing two (2) air compressors, including associated piping, valves, instruments, controls, appurtenance.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Provide air compressor removal and replacement. Furnish, deliver, and install one (1) air compressors. Work shall also include the removal and disposal of the existing two (2) air compressors, including associated piping, valves, instruments, controls, appurtenance.
AvailableProject can be summarized to include replacement of a roof mounted makeup air unit.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Project can be summarized to include replacement of a roof mounted makeup air unit.
AvailableRemoval and replacement of fire suppression air compressors.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Removal and replacement of fire suppression air compressors.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis