Work includes installation of 35' of cipp/sipp in the 4", cast iron, sanitary sewer line from the 3" toilet flange in the bridal suite to end at the base of the vertical stack overlapping into the newly installed pvc in the basement. Excavating and removing the existing building trap, replacing it with new schedule 40 pvc piping and a brass floor cleanout. Once the replacement is complete, the area will be backfilled, compacted, and finished with concrete to match the existing floor grade. Following the excavation work, the team will install 55' of cipp within the 4"- 6", cast iron, sanitary sewer line, starting at the pvc transition in the basement and ending at and overlapping the existing downstream cipp liner.