Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes to replace upper and lower sections of the hangar 2 roof system and roof drain pipes, and hangar 3 roof replacement in full.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes hangar roof, deck and door replacement.
Posted Date
Dec 9, 2025
Due Date
Jan 27, 2026
Release: Dec 9, 2025
Close: Jan 27, 2026
Work includes hangar roof, deck and door replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of re-roof of existing metal roof system, replacement of light transmitting panels.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Work consist of re-roof of existing metal roof system, replacement of light transmitting panels.
AvailableRoof Replacement Areas A, A1, B, C, D, E, E1, F, G, PH-1, PH-2, PH-3 & PH-4 project.
Posted Date
Jan 12, 2026
Due Date
Feb 23, 2026
Release: Jan 12, 2026
Close: Feb 23, 2026
Roof Replacement Areas A, A1, B, C, D, E, E1, F, G, PH-1, PH-2, PH-3 & PH-4 project.
AvailableRemoval of current roofing materials on a 100 x 800' 8,000 SF, installation of 24-gauge snap lock roof system, installation of new 4" insulation, installation of ridge cap, installation of rake trim and gutter trim, installation of 50 FT gutter to match existing gutter, installation of 3 downspouts, and installation of 150' roof to wall trim.
Posted Date
Jan 9, 2026
Due Date
Jan 28, 2026
Release: Jan 9, 2026
Close: Jan 28, 2026
Removal of current roofing materials on a 100 x 800' 8,000 SF, installation of 24-gauge snap lock roof system, installation of new 4" insulation, installation of ridge cap, installation of rake trim and gutter trim, installation of 50 FT gutter to match existing gutter, installation of 3 downspouts, and installation of 150' roof to wall trim.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →