Summary
Work includes 1 LS of clearing and grubbing; 405 SF of walk removed; 45 CY of excavation, including embankment construction; 100 SY of subgrade compaction; 17 CY of excavation of subgrade; 100 SY of geogrid; 1838 SY of 1-1/2" pavement planing, asphalt concrete; 11 CY of asphalt concrete base, PG64-22, (449); 25 CY of aggregate base; 175 Gal of non-tracking tack coat, 0.09 gal./S.Y.; 5 CY of asphalt concrete intermediate course, type 2, (449); 81 CY of asphalt concrete surface course, type 1, (449), pg64-22; 72 ft of hand railing (aluminum); 4 ft of concrete steps, type a, as per plan; 873 sf of 4" concrete walk; 140 SF of curb misc.: barrier wall; 10 FT of 4" conduit, type b, 707.45, storm repair. See attached file.