Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of removal of improvements; 7,760 LF of misc. Modified shaping slopes class iii; 3,216.600 TN of misc. permanent aggregate edge treatment; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 2, 2025
Close: Dec 23, 2025
Bridge rehabilitation project.
AvailableWiden, Resurface, and Bridge. Including 8,396 Cy aggregate base Type A; 39,775 SY subgrade, method B; 32,986 SY separator fabric; 32,186 SY geogrid reinforcement; 13,538 ton superpave, type S3(PG 64-22 OK); 3,300 ton superpave, Type S4(PG 70-28 OK); 6,141 SY cold milling pavement; 107 CY P.C. Concrete for pavement; 1,727 SY of 4" concrete sidewalk; 179 SY of 4" decorative concrete sidewalk; 5 ea manhole (8' dia); 2 ea fire hydrant reset; 1,729 LF of 54" R.C. Pipe class III; 10 LF of 28" X18" R.C. pipe arch class A-III; 29 LF of 15" corrugate polypropylene pipe. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Widen, Resurface, and Bridge. Including 8,396 Cy aggregate base Type A; 39,775 SY subgrade, method B; 32,986 SY separator fabric; 32,186 SY geogrid reinforcement; 13,538 ton superpave, type S3(PG 64-22 OK); 3,300 ton superpave, Type S4(PG 70-28 OK); 6,141 SY cold milling pavement; 107 CY P.C. Concrete for pavement; 1,727 SY of 4" concrete sidewalk; 179 SY of 4" decorative concrete sidewalk; 5 ea manhole (8' dia); 2 ea fire hydrant reset; 1,729 LF of 54" R.C. Pipe class III; 10 LF of 28" X18" R.C. pipe arch class A-III; 29 LF of 15" corrugate polypropylene pipe. See attached file.
AvailableMaintenance and Rehabilitation of Kutz Mill Covered Bridge #46E and Greenawalt Bridge #32A.
Posted Date
Nov 24, 2025
Due Date
Jan 15, 2026
Release: Nov 24, 2025
Close: Jan 15, 2026
Maintenance and Rehabilitation of Kutz Mill Covered Bridge #46E and Greenawalt Bridge #32A.
AvailableRehabilitation of Bridge No. 142, including mill and partial patching of the concrete bridge deck, concrete overlay, and replacement of approach paving.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Rehabilitation of Bridge No. 142, including mill and partial patching of the concrete bridge deck, concrete overlay, and replacement of approach paving.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis