Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
506 SY class ii base course (12" thick) (crushed stone); 2,553 CY aggregate surface course (adjusted vehicular measurement); 23,153 ton asphalt concrete.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
10,137 ton asphalt concrete; 1,109 ton asphalt concrete, drives, turnouts and miscellaneous; 20,949 gal asphalt material (crs-2p emulsion); 30,808 SY aggregate (s2).
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
10,137 ton asphalt concrete; 1,109 ton asphalt concrete, drives, turnouts and miscellaneous; 20,949 gal asphalt material (crs-2p emulsion); 30,808 SY aggregate (s2).
AvailableApprox. 2,194,319 SF bridge deck concrete sealer.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Approx. 2,194,319 SF bridge deck concrete sealer.
AvailableBridge replacement work includes approx. 1 LS clearing & grubbing, 84 CY drainage excavation, 436.7 TN asphalt concrete, 1,080 SY milling, 102 SY 16.5" pavement patching, 100 LF guardrail transitions, 59 SY erosion control system, 0.44 AC hydro-seeding, 0.1 Mile rumble strips, 1,080 INLF saw cutting asphalt pavement, 0.161 Mile 4" plastic pavement striping.
Posted Date
Dec 16, 2025
Due Date
Jan 14, 2026
Release: Dec 16, 2025
Close: Jan 14, 2026
Bridge replacement work includes approx. 1 LS clearing & grubbing, 84 CY drainage excavation, 436.7 TN asphalt concrete, 1,080 SY milling, 102 SY 16.5" pavement patching, 100 LF guardrail transitions, 59 SY erosion control system, 0.44 AC hydro-seeding, 0.1 Mile rumble strips, 1,080 INLF saw cutting asphalt pavement, 0.161 Mile 4" plastic pavement striping.
AvailableBridge replacement work includes approx. 785 CY drainage excavation, 435 TN asphalt concrete, 82 SY 15" pavement patching, 739 INLF saw cutting, 100 LF guardrail transitions, 196 LF barbed wire fence, 326 SY erosion control system, 32 LB seeding, 03247 Mile rumble strips, 24 SF sign, 0.584 Mile plastic pavement striping, 1,300 LF 18" precast concrete piles.
Posted Date
Dec 16, 2025
Due Date
Jan 14, 2026
Release: Dec 16, 2025
Close: Jan 14, 2026
Bridge replacement work includes approx. 785 CY drainage excavation, 435 TN asphalt concrete, 82 SY 15" pavement patching, 739 INLF saw cutting, 100 LF guardrail transitions, 196 LF barbed wire fence, 326 SY erosion control system, 32 LB seeding, 03247 Mile rumble strips, 24 SF sign, 0.584 Mile plastic pavement striping, 1,300 LF 18" precast concrete piles.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →