Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of removal of existing boiler HVAC system and replacement, but not limited to, a new HVAC replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project consists of replacing 7 HVAC systems in occupied apartments.
Posted Date
Jan 18, 2026
Due Date
Feb 16, 2026
Release: Jan 18, 2026
Close: Feb 16, 2026
This project consists of replacing 7 HVAC systems in occupied apartments.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes HVAC replacement.
Posted Date
Jan 18, 2026
Due Date
Feb 23, 2026
Release: Jan 18, 2026
Close: Feb 23, 2026
Work includes HVAC replacement.
AvailableWaukegan Public Library is soliciting sealed lump-sum bids for the AHU (HVAC) Replacement Project at its facility. A non-mandatory walkthrough is scheduled for January 20, 2026 at 9:00 AM, and a 10% bid bond is required. Sealed bids are due by 10:00 AM on February 10, 2026 at Waukegan Public Library, after which they will be publicly opened and read.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
Waukegan Public Library is soliciting sealed lump-sum bids for the AHU (HVAC) Replacement Project at its facility. A non-mandatory walkthrough is scheduled for January 20, 2026 at 9:00 AM, and a 10% bid bond is required. Sealed bids are due by 10:00 AM on February 10, 2026 at Waukegan Public Library, after which they will be publicly opened and read.
AvailableWork includes gymnasium and office HVAC renovations includes general construction heating, ventilation and air conditioning construction electrical construction.
Posted Date
Jan 30, 2026
Due Date
Feb 19, 2026
Release: Jan 30, 2026
Close: Feb 19, 2026
Work includes gymnasium and office HVAC renovations includes general construction heating, ventilation and air conditioning construction electrical construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →