Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Woodstock issued a solicitation titled 'Gym Floor Replacement at the Woodstock Recreation Center' for replacement of the gym flooring at the Woodstock Recreation Center in Georgia. The solicitation was published on 2025-12-05 and closes on 2026-01-08 at 10:00 AM EST; solicitation details and bid documents are available on the buyer's BidNet posting (registration required). This is a construction procurement (gym floor replacement), not a grant, and it is open as of 2025-12-27.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide dumpster(s) for disposal of existing floor. Demo includes existing wall base and doorway transitions. Remove all adhesive, dirt, etc. From existing concrete slab. Clean slab and prepare the slab to accept new wood floor system.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Provide dumpster(s) for disposal of existing floor. Demo includes existing wall base and doorway transitions. Remove all adhesive, dirt, etc. From existing concrete slab. Clean slab and prepare the slab to accept new wood floor system.
AvailableThe project includes replacing the gym HVAC units on the diane sayre recreation center. The project involves removing the three existing gym HVAC units and installing two new HVAC units.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
The project includes replacing the gym HVAC units on the diane sayre recreation center. The project involves removing the three existing gym HVAC units and installing two new HVAC units.
AvailableGym Floor Maintenance.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
Gym Floor Maintenance.
AvailableThe project includes a roof replacement on the diane sayre recreation center. The project involves removing the existing membrane roofing and installing new TPO roofing membrane, and replacing the existing roof translucent panels at the natatorium.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
The project includes a roof replacement on the diane sayre recreation center. The project involves removing the existing membrane roofing and installing new TPO roofing membrane, and replacing the existing roof translucent panels at the natatorium.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis