Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The USDA Forest Service issued RFQ 12443926Q0007 for maintenance of existing drainage structures including culvert cleaning, laying, and repairing in the Eastern Divide Ranger District. This procurement is a Total Small Business set-aside under NAICS 237110 with performance locations in various Virginia counties. Quoters must submit their responses by the deadline of February 5, 2026, following the specific terms and evaluation criteria provided in the solicitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cleaning, laying and repairing existing drainage structures cleaning drainage structures in place. Remove foreign material on both ends of structure within the first and last 3 LF of the structure cleaning drainage structures in place. Remove foreign material on both ends of structure within the first and last 3 LF of the structure *dispose of removed material. Regrade inlet and outlet channels at structures to provide positive drainage. Reshape inlet to direct flow into the structure entrance.
Posted Date
Jan 23, 2026
Due Date
Feb 5, 2026
Release: Jan 23, 2026
Close: Feb 5, 2026
Cleaning, laying and repairing existing drainage structures cleaning drainage structures in place. Remove foreign material on both ends of structure within the first and last 3 LF of the structure cleaning drainage structures in place. Remove foreign material on both ends of structure within the first and last 3 LF of the structure *dispose of removed material. Regrade inlet and outlet channels at structures to provide positive drainage. Reshape inlet to direct flow into the structure entrance.
AvailableProject consists of culvert replacement.
Posted Date
-
Due Date
Mar 24, 2026
Release: -
Close: Mar 24, 2026
Project consists of culvert replacement.
AvailableProvide culvert cleaning.
Posted Date
Jan 13, 2026
Due Date
Feb 11, 2026
Release: Jan 13, 2026
Close: Feb 11, 2026
Provide culvert cleaning.
AvailableWork consists of approx. the services of a consulting engineering firm to provide the design of construction ready plan sets for the rehabilitation/replacement of a 12x10 reinforced concrete box culvert under Murray Rd. and any/all required/associated hydraulic analysis/design necessary to achieve no rise certifications for both upstream and downstream conditions.
Posted Date
Dec 19, 2025
Due Date
Jan 30, 2026
Release: Dec 19, 2025
Close: Jan 30, 2026
Work consists of approx. the services of a consulting engineering firm to provide the design of construction ready plan sets for the rehabilitation/replacement of a 12x10 reinforced concrete box culvert under Murray Rd. and any/all required/associated hydraulic analysis/design necessary to achieve no rise certifications for both upstream and downstream conditions.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis