Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 590 SF remove existing striping, legend, or marking, 290 LF install 12" white thermoplastic limit line, 480 LF install 6" double-yellow centerline, 275 LF furnish and install 12" thermoplastic crosswalk, 200 LF install red curb, 3 EA construct new curb ramp, 3 EA furnish and install 3' x 4' ADA truncated domes. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of a full traffic signal with a pedestrian walk signal along with ADA improvements to the intersection. In addition, construct a side path on college avenue along the pelican marsh natural area from the intersection to the existing sidewalk. Work includes: asphalt and concrete removals, earthwork, erosion control, curb, sidewalks, landscaping, traffic signal foundations, installation of traffic signals (traffic signal controller, controller cabinet and poles.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Installation of a full traffic signal with a pedestrian walk signal along with ADA improvements to the intersection. In addition, construct a side path on college avenue along the pelican marsh natural area from the intersection to the existing sidewalk. Work includes: asphalt and concrete removals, earthwork, erosion control, curb, sidewalks, landscaping, traffic signal foundations, installation of traffic signals (traffic signal controller, controller cabinet and poles.
Premium
Access the largest public sector contact database
Work includes reconstruction of a traffic signal and installation of a fire signal, along with re-striping and ramp reconstruction work.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Work includes reconstruction of a traffic signal and installation of a fire signal, along with re-striping and ramp reconstruction work.
AvailableProvide task order contract for the 2026 traffic signal installation project package 2.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Provide task order contract for the 2026 traffic signal installation project package 2.
AvailableProvide on-call traffic signal pole and street light pole repair services. The primary purpose of this contract is to set up an on-call contractor to assist with clearing damaged traffic signal and street light poles in the public right-of-way during emergency situations, performing emergency repairs for traffic signal poles utilizing temporary wood poles, and to replace knocked down poles in non-emergency situations on a later date. The Transportation Division of the Public Works Maintenance Center (PWMC) will contact the Contractor for the services requested.
Posted Date
Dec 1, 2025
Due Date
Dec 30, 2025
Release: Dec 1, 2025
Close: Dec 30, 2025
Provide on-call traffic signal pole and street light pole repair services. The primary purpose of this contract is to set up an on-call contractor to assist with clearing damaged traffic signal and street light poles in the public right-of-way during emergency situations, performing emergency repairs for traffic signal poles utilizing temporary wood poles, and to replace knocked down poles in non-emergency situations on a later date. The Transportation Division of the Public Works Maintenance Center (PWMC) will contact the Contractor for the services requested.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis