Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal of existing metal beam guard rails, installing new metal beam guard rails, end treatments, concrete barriers, and signs, and other related work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes removal of existing metal beam guard rails, installing new metal beam guard rails, end treatments, concrete barriers, and signs, and other related work.
Posted Date
Nov 4, 2025
Due Date
Dec 16, 2025
Release: Nov 4, 2025
Close: Dec 16, 2025
Work includes removal of existing metal beam guard rails, installing new metal beam guard rails, end treatments, concrete barriers, and signs, and other related work.
Premium
Access the largest public sector contact database
Release: Dec 2, 2025
Close: Dec 22, 2025
Replacement of guardrail fence.
AvailableProcurement of construction services for the replacement of a culvert, sanitary sewer, and roadway on Farmwood Blvd, Concord NC.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Procurement of construction services for the replacement of a culvert, sanitary sewer, and roadway on Farmwood Blvd, Concord NC.
AvailableCity of Groton seeks proposals for materials and labor to replace the wood on an existing Ironwood guardrail fence at the Submarine Veterans WWII National Memorial (approx. 180 ft, 30 posts). Scope: remove and replace wood only (reuse existing metal hardware); base material: pressure-treated red pine with alternative pricing for red cedar; include optional pricing to strip/prime/repaint hardware and a price list for metal hardware replacement. Bonding, insurance, permits, and an optional pre-bid site meeting are required.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
City of Groton seeks proposals for materials and labor to replace the wood on an existing Ironwood guardrail fence at the Submarine Veterans WWII National Memorial (approx. 180 ft, 30 posts). Scope: remove and replace wood only (reuse existing metal hardware); base material: pressure-treated red pine with alternative pricing for red cedar; include optional pricing to strip/prime/repaint hardware and a price list for metal hardware replacement. Bonding, insurance, permits, and an optional pre-bid site meeting are required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis