Summary
Work consist of 1,111 ea of splice closures/trays furnish and installation, 81 ea of termination panels and trays installation, 237 ea of fiber splices/terminations and testing, traffic control system, installation of conduit via directional bore, trenching, or micro trenching; installation of fiber-optic cable in conduit; installation of utility pull boxes within sidewalks and roadway shoulders and over-excavation (if required); restoration of concrete, pavement, striping, and landscaping; installation of splice enclosures; installation of fiber termination panels; testing of fiber splices and terminations; and installation of hut systems.