County of Tuolumne
Provide prefabricated bathroom structure within an existing parking lot. Site work will include, but will not be limited to saw-cutting/asphalt removal and edge protection (remaining asphalt), surface scarification, excavation, fill placement, sub-base preparation, base rock installation. Concrete surface installation, surface striping, and signage installation for accessible vehicle parking. Temporary and permanent best management practices for erosion control measures, concrete washout, and continuous good housekeeping practices. Site utilities will include a sewer connection, water connection, drainage system, and electrical connection (all underground).
Release
Jan 14, 2025
Close
Feb 13, 2025