Summary
Work includes clearing and grubbing; electrical work; 550 CY of bridge excavation; 55 CY of rock excavation; 860 SY of fine grading and compacting; inspection and testing for asbestos; 1 EA of catch basin; 2 EA of special manhole; 30 LF of 48" reinforced concrete pipe; 125 LF of 8" DI water pipe; 2 EA of 18" coupling; 50 LF of 8" water pipe insulation; 155 SY of pavement micro milling; 60 TN of superpave bridge surface course-9.5(SSC-B-9.5); 490 LF of HMA joint seal; 300 LF of sawcutting asphalt pavement; 85 LF of guardrail, TL-3(single face); 200 LF of temporary fence; 90 SY of seeding; 100 LF of sediment control; 250 LF of 6" reflectorized yellow line; 1,230 SF of bituminous dampproofing; bridge structure.