Open RFPRelocation of 12.47kv Distribution Structures and 115kv Transmission Structures Along Evans RFP
Description: Relocation of 12.47kv Distribution Structures and 115kv Transmission Structures. Work Included: Construction of a new 12.47 kV distribution lines and 115 kV
transmission lines adjacent to the existing line to accommodate NCDOT
road widening. Installation of approx. 150 distribution structures, 18 transmission structures, 135,000 FT of primary overhead conductor, 26,000 FT of primary underground conductor, and 110 bollards, as well as the removal
of 150 distribution structures, 18 transmission structures, 120,000 FT of
overhead primary and 27,000 of underground primary.Transfer or replacement of all poles, equipment, primary and secondary conductors, and related hardware.