Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 4100 SY of subgrade preparation; minor paving type i, hma sp-iv; 27 CY of structural concrete, class aa; 6060 lb of reinforcing bars grade 60; 89 LF of 18" storm drain culvert pipe; 150 SY of concrete sidewalk 4" ; 4 ea manhole type c-6' diameter 0' to 6' depth; 140 LF of steel posts and base posts for construction signing. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Project consists of the construction of 885 LF of rccp storm drain pipe, inlets, manholes, and related work.
Posted Date
Dec 2, 2025
Due Date
Jan 12, 2026
Release: Dec 2, 2025
Close: Jan 12, 2026
Project consists of the construction of 885 LF of rccp storm drain pipe, inlets, manholes, and related work.
AvailableThe City of Palmdale seeks a qualified consultant to provide construction management and observation services for the 45th Street Sewer, Storm Drain and Street Renovation Project, including constructability review, construction observation, materials testing, and public outreach. The work includes installation of a new storm drain system, associated street improvements, and an 18-inch sewer relief line with an estimated project value of $7.5M–$7.6M. The project is expected to start in March 2026 and be completed by Spring 2027.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
The City of Palmdale seeks a qualified consultant to provide construction management and observation services for the 45th Street Sewer, Storm Drain and Street Renovation Project, including constructability review, construction observation, materials testing, and public outreach. The work includes installation of a new storm drain system, associated street improvements, and an 18-inch sewer relief line with an estimated project value of $7.5M–$7.6M. The project is expected to start in March 2026 and be completed by Spring 2027.
AvailableRelease: Dec 17, 2025
Close: Jan 12, 2026
Lining of storm drain.
AvailableMajor work items include, but are not limited to, demolition/removal of existing storm drain pipe and inlets, installing new 18 reinforced concrete pipe (rcp) storm drain, connecting to existing storm drain inlets and installing two (2) new inlets, grading and surface restoration, erosion & sediment control, maintenance of traffic, and final stabilization and cleanup.
Posted Date
Nov 25, 2025
Due Date
Jan 9, 2026
Release: Nov 25, 2025
Close: Jan 9, 2026
Major work items include, but are not limited to, demolition/removal of existing storm drain pipe and inlets, installing new 18 reinforced concrete pipe (rcp) storm drain, connecting to existing storm drain inlets and installing two (2) new inlets, grading and surface restoration, erosion & sediment control, maintenance of traffic, and final stabilization and cleanup.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis