CityTX
Posted
Nov 1, 2026
Nov 17, 2026
Street & Drainage Improvements RFP
Work includes 13,235 SY of hmac pavement and cement base reconstruction, installation of rcp culverts, ditch regrading.
Description: Stormwater drainage improvements, including pipe and box culvert installation, drainage structure work, and roadway and site restoration.
City · AL, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
City staff reported funded FY25 design and proposed $2.42 million for construction of Green Valley Drainage Improvements in two phases.
um that's Green Valley drainage improvements project. Um in fiscal year 25 the design of this project was funded and so we have a design in place ready to go for this project. Uh this project was um a project that was identified in the Scholes study after the October 2021 flood. So what this does is this implements the recommendations from that study post…
Finance Committee of the City Council Budget Hearings
Board meeting · Sep 25, 2025
Board meeting
Hoover City Council approved Green Valley stormwater improvements after completion of the survey, H&H study, and engineering design plans, with resident easement waivers still required.
Resolution number 878026. This is item 15 on the agenda. Uh it's also a stormwater resolution and it relates to Napier Drive in the Green Valley area of the city. Mr. President, I make a motion to approve resolution number 87-80-26. Second. Have a motion and a second. Mr. Brommer. Okay, for clarification here, it's a affecting multiple streets in the area…
Board meeting
Hoover staff reported that Green Valley drainage improvements had completed design and utility coordination and were being prepared for bidding in July.
So I'll start with Green Valley drainage improvements uh for this project. The H&H study has been complete. Um the survey work has also been complete and now we are working uh with the revised easements uh to now reach out to the property owners to acquire the the easements and then get their required waiverss that will be needed for the project. Uh the…
City Council Work Session
Board meeting · Jun 4, 2026
Board meeting
Hoover staff reported that Green Valley Phases 1 and 2 would replace damaged undersized storm drainage and advertise for bids on October 28.
Green Valley phase one and two. So, this is You can see the project location there. That's just north of 459, um south of Patton Chapel, and just to the west of Highway 31. So, there's multiple damaged undersized storm pipe along Napier, Paulette, and Charlotte Drive. So, the project will include replacement of existing culverts, headwalls, curbs, inlets,…
City Council of Hoover Meeting
Board meeting · Oct 26, 2026
RFP published
Proposals due (14 days left)
City Council City Council Meeting
Board meeting · Mar 9, 2026
Adjacent opportunities open for bidding right now.
CityTX
Posted
Nov 1, 2026
Nov 17, 2026
Work includes 13,235 SY of hmac pavement and cement base reconstruction, installation of rcp culverts, ditch regrading.
CountyLA
Posted
Nov 6, 2024
Nov 19, 2026
Culverts and drainage improvements.
CityAL
Posted
-
Nov 18, 2026
Construction of drainage improvements, including storm drain pipe and drainage structures.
CityMS
Posted
Oct 14, 2026
Nov 13, 2026
Work inlcudes installation of approx 222 LF of 18 reinforced concrete pipe, installing 4 grate inlets, removing approx 60 LF of existing 6 and 10 corrugated plastic drain pipe, removing 2 existing grate inlets, grading areas along the run of storm drain pipe to drain, installing solid sod on disturbed areas, and all other necessary appurtenances.
Decision makers connected to this RFP from City of Hoover.