Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Great Barrington Department of Public Works is soliciting lump‑sum bids to realign a portion of West Sheffield Road that has been partially closed due to a slope failure. The project is subject to MGL c.30 §39M, prevailing wage, and MassDOT contractor prequalification, with bid documents provided through Tighe & Bond. Sealed bids are due by 2:00 PM ET on January 8, 2026, and electronic submission is allowed via COMMBUYS.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This is a solicitation for construction/engineering work to interconnect the Great Barrington Fire District with the Housatonic Water Works Company at Christian Hill Road in Great Barrington, MA. A non-mandatory pre-bid conference was scheduled for 2026-01-28 at 10:00 AM and sub-bids for painting, HVAC, and electrical are due 2026-02-17 at 4:00 PM. The general bid closing date is 2026-02-25 and bid document access requires registration on the buyer's site.
Posted Date
-
Due Date
Feb 25, 2026
Close: Feb 25, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is a solicitation for construction/engineering work to interconnect the Great Barrington Fire District with the Housatonic Water Works Company at Christian Hill Road in Great Barrington, MA. A non-mandatory pre-bid conference was scheduled for 2026-01-28 at 10:00 AM and sub-bids for painting, HVAC, and electrical are due 2026-02-17 at 4:00 PM. The general bid closing date is 2026-02-25 and bid document access requires registration on the buyer's site.
AvailableSitelogiQ is soliciting bids for the West Fork Community School District’s Sheffield Middle/High School 2026 Facility Improvements in Iowa. Bid documents and planholder information are available through the Rapids Reproductions online planroom, and bids are due on January 29, 2026. The scope comprises facility improvements at the Sheffield MS/HS campus with multiple trade packages to be detailed in the bidding documents.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
SitelogiQ is soliciting bids for the West Fork Community School District’s Sheffield Middle/High School 2026 Facility Improvements in Iowa. Bid documents and planholder information are available through the Rapids Reproductions online planroom, and bids are due on January 29, 2026. The scope comprises facility improvements at the Sheffield MS/HS campus with multiple trade packages to be detailed in the bidding documents.
AvailableProvide geotechnical report for WB realignment, intersection improvements.
Posted Date
Dec 23, 2025
Due Date
Jan 12, 2026
Release: Dec 23, 2025
Close: Jan 12, 2026
Provide geotechnical report for WB realignment, intersection improvements.
AvailableWork consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment control, landscaping, traffic control and protection, detour routing, pavement marking and signing, sidewalk. See outside link.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
Work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment control, landscaping, traffic control and protection, detour routing, pavement marking and signing, sidewalk. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →