Summary
Work includes clearing & grubbing, unclassified excavation (0 to 100 CY), unclassified excavation (101 to 300 CY), unclassified excavation (301 plus CY), borrow (0 to 100 CY) pit run, borrow (101 to 300 CY) pit run, borrow (301 plus CY) pit run, subgrade prep (0 to 1,000 SY), subgrade prep (1,001 to 4,000 SY), subgrade prep (4,001 to 16,000 SY), subgrade prep (16,001 to 24,000 SY), subgrade prep (24,001 plus SY), linear grading 12' to 60' width (0 to 1 mile), linear grading 12' to 60' width (1. 1 to 5 mile), linear grading 12' to 60' width (5.1 to 10 mile), linear grading 12' to 60' width (10.1 plus mile), 6" depth - base course nmdot spec contractor furnished, hauled & installed complete in place (0 to 5,000 SY). See attached file.