Summary
Project consists of reconstruction of water main improvements all within township: construction shall include 4,725 LF of 8" ductile iron water main; 240 linear feet of 6" ductile iron water main; 5700 LF of 1" copper water service: 87 water service connections including 87 meter installations (licensed plumber required); 10 6-inch valved hydrant assemblies; live tapping of an existing 16-inch ductile iron water main; 17,400 square yards or pavement removal; 6,615 tons of mdot 13a HMA ; 10,050 linear feet of bituminous curb; signing and traffic control; cleanup and restoration and other miscellaneous work items that normally are included with the described work items.