Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx: 2,053 LF CIPP 36"; 5,786 LF 30 day post CCTV inspection; 5,786 LF heavy cleaning 36". 1 LS mobilization; 1 LS maintaining traffic, stage 1; 1 LS maintaining traffic, stage 2; 1 LS maintaining traffic, stage 3; 183 SY HMA surface, rem; 14 EA manhole cone, remove, salvage and reset; 1 ea manhole cone, furnish new; 22 EA manhole cover, adj; 14 EA sanitary manhole frame & cover replacement; 8 EA storm manhole frame & cover replacement; 1 ea gate valve box, reconstruct; 1 EA gate valve box, adj; 56 SY subbase, CIP, 12"; 55 tn aggregate base; 410 SY cold patch, 4"; 191 LF temporary bypass casing; 1 LS temporary bypass pumping, phase 1; 1 LS temporary bypass pumping, phase 2; 1 LS temporary bypass pumping, phase 4; 1 LS temporary bypass pumping, phase 5. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Work includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
AvailableSewer TV Inspection, Locating Cleaning, and Cured-In-Place-Pipe (CIPP) Lining, On-Call Services.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Sewer TV Inspection, Locating Cleaning, and Cured-In-Place-Pipe (CIPP) Lining, On-Call Services.
AvailableWork includes approx 5,500 LF clean and CCTV sewer main; 2,000 LF 8"-10" CIPP main by Hot/Steam or UV light cure; 20 EA lateral seal; 115 LF lateral lining; 1 LS sanitary sewer bypass pumping.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Work includes approx 5,500 LF clean and CCTV sewer main; 2,000 LF 8"-10" CIPP main by Hot/Steam or UV light cure; 20 EA lateral seal; 115 LF lateral lining; 1 LS sanitary sewer bypass pumping.
AvailableThe work consists approx. 1,950 lf of 10” and 12” cured-in-place-pipe along with service reconnections and post videotaping.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
The work consists approx. 1,950 lf of 10” and 12” cured-in-place-pipe along with service reconnections and post videotaping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis