Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Grady Health System
Work includes level 1 renovation: 8,000 SF renovation of an existing acute care clinic, imaging suite, and old pharmacy space; renovated space will accommodate a new x-ray and ultrasound suite along with exam rooms and community outreach services; extensive exterior skin point up and window replacement. Usp 800 conversion: 1,000 SF renovation of existing pharmacy space to convert a usp 797 compounding room to a usp 80 compounding room. Facade repairs: clean exterior brick and stone facade; repair eifs at stair tower; remove & replace sealant at locations noted (rooftop expansion joint covers, masonry expansion joints, shelf angles, limestone joints, phenolic panel joints, aluminum windows sealed shut, etc); Repair brick stepped cracking, repoint brick mortar joints as necessary; Repair cracked limestone panels, remove & patch abandoned anchors in limestone panels; Clean & coat exposed portion of steel lintels at window openings. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Gainesville
Requesting individual sealed proposals for the renovation of approx 9,500 SF of the main public lobby and municipal court office space located on the second floor. Work consists of new offices, breakroom, conference room, filing room, transaction counter, main lobby and a new north entrance with landing and stairs down to sidewalk level. Exterior work includes sidewalks, landscaping and ornamental fencing. The renovation will consist of select demolition, construction of new walls, minor plumbing, painting, replacement of carpet, tile, installation of new ceiling tiles, and other aesthetic improvements.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
City of Gainesville
Close: Jan 7, 2026
Requesting individual sealed proposals for the renovation of approx 9,500 SF of the main public lobby and municipal court office space located on the second floor. Work consists of new offices, breakroom, conference room, filing room, transaction counter, main lobby and a new north entrance with landing and stairs down to sidewalk level. Exterior work includes sidewalks, landscaping and ornamental fencing. The renovation will consist of select demolition, construction of new walls, minor plumbing, painting, replacement of carpet, tile, installation of new ceiling tiles, and other aesthetic improvements.
AvailableForest Hills Public Schools
Provide Elementary Renovation.
Posted Date
Nov 9, 2025
Due Date
Dec 3, 2025
Release: Nov 9, 2025
Forest Hills Public Schools
Close: Dec 3, 2025
Provide Elementary Renovation.
AvailableRedmond School District
Work consists of concession stand interior renovation. The renovation will include creating a space that is functional and visually appealing, combining two rooms into one, installing new wall paneling, cabinetry, and stainlesssteel countertops, relocating/installing equipment infrastructure, and upgrading electrical and plumbing systems as necessary.
Posted Date
Oct 28, 2025
Due Date
Nov 24, 2025
Release: Oct 28, 2025
Redmond School District
Close: Nov 24, 2025
Work consists of concession stand interior renovation. The renovation will include creating a space that is functional and visually appealing, combining two rooms into one, installing new wall paneling, cabinetry, and stainlesssteel countertops, relocating/installing equipment infrastructure, and upgrading electrical and plumbing systems as necessary.
AvailableBrighton Area School District
Work consists of an interior renovation to an existing science room within the high school.
Posted Date
Nov 6, 2025
Due Date
Dec 2, 2025
Release: Nov 6, 2025
Brighton Area School District
Close: Dec 2, 2025
Work consists of an interior renovation to an existing science room within the high school.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis