Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 450 CY undercut excavation; 400 CY select granular material; 400 SY geotextile for soil stabilization; 20 ton foundation conditioning material, minor structures; 51 SY foundation conditioning geotextile; 36 LF 24" drainage pipe; 2 EA drainage pipe elbows (15); 68 LF 15" RC pipe culverts, class iv; 48 LF 18" RCP pipe culverts, class iv; 94 LF pipe removal; 100 CY shallow undercut; 200 ton class iv subgrade stabilization; 300 SY geotextile for subgrade stabilization; 17 TON aggregate base course; 200 SY incidental milling; 270 ton asphalt conc base course, type b25. 0c. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide bridge replacement: grading, drainage, paving, and structure.
Posted Date
Dec 22, 2025
Due Date
Jan 13, 2026
Release: Dec 22, 2025
Close: Jan 13, 2026
Provide bridge replacement: grading, drainage, paving, and structure.
AvailableRequesting bids for grading, paving, drainage, and structure work on SR 1850 (Wade Stedman Rd), Structure 29 over Buck Creek in Cumberland County.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
Requesting bids for grading, paving, drainage, and structure work on SR 1850 (Wade Stedman Rd), Structure 29 over Buck Creek in Cumberland County.
AvailableLump sum ls mobilization; lump sum ls construction surveying; 1 acr supplementary clearing & grubbing; 550 cy undercut excavation; lump sum ls grading; 6,100 cy borrow excavation; 15 cy drainage ditch excavation; 200 cy select granular material; 400 sy geotextile for soil stabilization; 760 sf temporary shoring; lump sum ls generic grading item type 2 bridge approach fill, station 15+22. 40 -l-; 128 ton foundation conditioning material, minor structures; 501 sy foundation conditioning geotextile; 24 lf 15" drainage pipe; 116 lf 18" drainage pipe. See attached file for full scope.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Lump sum ls mobilization; lump sum ls construction surveying; 1 acr supplementary clearing & grubbing; 550 cy undercut excavation; lump sum ls grading; 6,100 cy borrow excavation; 15 cy drainage ditch excavation; 200 cy select granular material; 400 sy geotextile for soil stabilization; 760 sf temporary shoring; lump sum ls generic grading item type 2 bridge approach fill, station 15+22. 40 -l-; 128 ton foundation conditioning material, minor structures; 501 sy foundation conditioning geotextile; 24 lf 15" drainage pipe; 116 lf 18" drainage pipe. See attached file for full scope.
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 300 cy undercut excavation; 5 CY drainage ditch excavation; 300 cy select granular material; 300 SY geotextile for soil stabilization; 10 ton foundation conditioning material, minor structures; 10 SY foundation conditioning geotextile; 24 LF 18" rc pipe culverts, class iv; 1 EA pipe clean out; 30 ton class iv aggregate stabilization; 60 ton aggregate base course; 50 SY milling asphalt pavement. See attached file for full scope.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 300 cy undercut excavation; 5 CY drainage ditch excavation; 300 cy select granular material; 300 SY geotextile for soil stabilization; 10 ton foundation conditioning material, minor structures; 10 SY foundation conditioning geotextile; 24 LF 18" rc pipe culverts, class iv; 1 EA pipe clean out; 30 ton class iv aggregate stabilization; 60 ton aggregate base course; 50 SY milling asphalt pavement. See attached file for full scope.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis