CityWI
Posted
Sep 9, 2026
Oct 27, 2026
Railroad Crossing Reconstruction - Phase 5 RFP
Reconstruction of thirteen (13) existing at- grade railroad crossings.
Description: Conduct a Grade Separated Railroad Crossing Alternatives Analysis Study to identify feasible locations and a locally-preferred location for a new grade-separated vehicular and pedestrian rail crossing.
City · MT, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Livingston.
These related opportunities are still open for bidding.
CityWI
Posted
Sep 9, 2026
Oct 27, 2026
Reconstruction of thirteen (13) existing at- grade railroad crossings.
CityCA
Posted
Oct 3, 2026
Oct 29, 2026
The City of Fountain Valley seeks a comprehensive compensation study and analysis covering all City employee groups, including sworn safety services. The consultant will survey salary and total compensation, compare them with relevant labor markets and comparable agencies, and review the City's pay structure for anomalies. Deliverables include recommendations with implementation strategies and fiscal-impact analysis, regular status reports, a final report to the City Manager, and a presentation on comparable agencies.
Central Vermont Regional Planning Commission
Special DistrictVT
Posted
Oct 5, 2026
Oct 26, 2026
The scope of work includes modeling the flow potential of the Winooski River, Little River, Graves and Thatcher Brook to determine the best options for flood mitigation within the community.
Connecticut Office of the Attorney General
State AgencyCT
Posted
Sep 5, 2026
Oct 21, 2026
Excavation, removal of concrete, joint and crack sealing, bridge sidewalk concrete.