Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Generation Park Management District
Relocation of 0.12 MGD Steel Package Wastewater Treatment Plant, Construction of Access Road, Site and Electrical Improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Hampton County Soil And Water Conservation District
The work consist of approx 1 LS mobilization; 1 LS erosion control; 1 LS demolition; 1 LS bypass pumping; 1 LS influent ps improvements (bypass connection, magnetic flow meter, hatch, pump guide rails, and piping & fittings); 1 LS installation of ecofixe/ biofixe modules; 1 LS flow splitter box; 2 EA 30 hp blowers; 1 LS replace effluent ultrasonic flowmeter on existing parshall flume; 1 LS headworks - rotary drum type; 1 LS ecofixe and biofixe modules (materials and startup); 49 SY containment pad; 20 SY equipment pad; 1 LS pole barn; 1 EA paa tank and appurtenances; 1 LS chemical metering skid, piping, and appurtenances. See attached file.
Posted Date
-
Due Date
Dec 16, 2025
Hampton County Soil And Water Conservation District
Close: Dec 16, 2025
The work consist of approx 1 LS mobilization; 1 LS erosion control; 1 LS demolition; 1 LS bypass pumping; 1 LS influent ps improvements (bypass connection, magnetic flow meter, hatch, pump guide rails, and piping & fittings); 1 LS installation of ecofixe/ biofixe modules; 1 LS flow splitter box; 2 EA 30 hp blowers; 1 LS replace effluent ultrasonic flowmeter on existing parshall flume; 1 LS headworks - rotary drum type; 1 LS ecofixe and biofixe modules (materials and startup); 49 SY containment pad; 20 SY equipment pad; 1 LS pole barn; 1 EA paa tank and appurtenances; 1 LS chemical metering skid, piping, and appurtenances. See attached file.
AvailableHarris County Municipal Utility District 70
Furnish and install a 0.540 MGD prepackaged steel basin wastewater treatment plant (Site work done under a separate contract). Work to include but not limited to supply of prefabricated WWTP Facility including headworks structure, aeration chambers, clarification unit, disinfection basin, sludge aerobic digester unit (dual stage), air distribution system, dechlorination system and building, walkways, and stairs.
Posted Date
Oct 16, 2025
Due Date
Dec 9, 2025
Release: Oct 16, 2025
Harris County Municipal Utility District 70
Close: Dec 9, 2025
Furnish and install a 0.540 MGD prepackaged steel basin wastewater treatment plant (Site work done under a separate contract). Work to include but not limited to supply of prefabricated WWTP Facility including headworks structure, aeration chambers, clarification unit, disinfection basin, sludge aerobic digester unit (dual stage), air distribution system, dechlorination system and building, walkways, and stairs.
AvailableCity of Marble Falls
MGC Contractors, Inc. (Construction Manager at Risk) is soliciting sealed proposals for multiple bid packages for the City of Marble Falls One Water 3 MGD Wastewater Treatment Plant & Related Facilities, including the Off-Site Lift Station, Pipeline, and Electrical/Instrumentation & Controls. Proposals are to be submitted electronically via the OpenGov project portal (Project ID: CIPWW-20210420 #2) with a due date of December 4, 2025 at 2:00pm Central Time.
Posted Date
Oct 17, 2025
Due Date
Dec 4, 2025
Release: Oct 17, 2025
City of Marble Falls
Close: Dec 4, 2025
MGC Contractors, Inc. (Construction Manager at Risk) is soliciting sealed proposals for multiple bid packages for the City of Marble Falls One Water 3 MGD Wastewater Treatment Plant & Related Facilities, including the Off-Site Lift Station, Pipeline, and Electrical/Instrumentation & Controls. Proposals are to be submitted electronically via the OpenGov project portal (Project ID: CIPWW-20210420 #2) with a due date of December 4, 2025 at 2:00pm Central Time.
AvailableCity of Henrietta
Work includes : construction of 0.850 mgd wastewater treatment plant, including raw wastewater lift station, aeration basin, clarifiers, sludge drying beds, chlorine contact basin, yard piping and miscellaneous site work.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
City of Henrietta
Close: Dec 16, 2025
Work includes : construction of 0.850 mgd wastewater treatment plant, including raw wastewater lift station, aeration basin, clarifiers, sludge drying beds, chlorine contact basin, yard piping and miscellaneous site work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis