Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Relocation of 0.12 MGD Steel Package Wastewater Treatment Plant, Construction of Access Road, Site and Electrical Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Installation of the proposed wwtp, including package mbr wwtp, influent and effluent lift stations, 2,100 lf of 8 effluent force main, concrete foundations, concrete driveway and pavement, storage building, flow measurement flume, yard piping, electrical duct bank, crushed limestone pad, chain link fence, outfall headwall and swale, and all associated site work.
Posted Date
-
Due Date
Feb 16, 2026
Close: Feb 16, 2026
Installation of the proposed wwtp, including package mbr wwtp, influent and effluent lift stations, 2,100 lf of 8 effluent force main, concrete foundations, concrete driveway and pavement, storage building, flow measurement flume, yard piping, electrical duct bank, crushed limestone pad, chain link fence, outfall headwall and swale, and all associated site work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
Posted Date
Dec 3, 2025
Due Date
Jan 26, 2026
Release: Dec 3, 2025
Close: Jan 26, 2026
Project generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
Provide Southside Water Reclamation Facility Expansion to 9.0 MGD.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Provide Southside Water Reclamation Facility Expansion to 9.0 MGD.
Available1 ea 1-1/2 HP teco gp 1/54 motor 1800 rpm fr 145t or approved equal.
Posted Date
Jan 22, 2026
Due Date
Jan 26, 2026
Release: Jan 22, 2026
Close: Jan 26, 2026
1 ea 1-1/2 HP teco gp 1/54 motor 1800 rpm fr 145t or approved equal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →