Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following golf course components: renovation of all sand bunkers, installation of new golf course irrigation sprinkler heads and two-wire control wire with controller and software, leveling and sodding of all tees, select pruning and thinning of trees and underbrush, and replacement of some areas of concrete cart path.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide executive golf course renovation project.
Posted Date
Jan 12, 2026
Due Date
Feb 17, 2026
Release: Jan 12, 2026
Close: Feb 17, 2026
Provide executive golf course renovation project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase of a golf course fairway mower.
Posted Date
Jan 12, 2026
Due Date
Jan 30, 2026
Release: Jan 12, 2026
Close: Jan 30, 2026
Purchase of a golf course fairway mower.
AvailableWork includes demolition and disposal of existing unclassified material, including concrete, curbing, existing split rail fence sections, and all existing plantings and mulch, utilizing saw cutting as needed, remove and dispose of existing septic system, install new drainage systems, including 4", 6", and 8" solid and perforated hdpe pipe, trench drains, downspout connections, and structures, install concrete pads. See attached file.
Posted Date
Jan 15, 2026
Due Date
Jan 30, 2026
Release: Jan 15, 2026
Close: Jan 30, 2026
Work includes demolition and disposal of existing unclassified material, including concrete, curbing, existing split rail fence sections, and all existing plantings and mulch, utilizing saw cutting as needed, remove and dispose of existing septic system, install new drainage systems, including 4", 6", and 8" solid and perforated hdpe pipe, trench drains, downspout connections, and structures, install concrete pads. See attached file.
AvailableProvide golf course chemicals and fertilizers on an as-needed basis.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
Provide golf course chemicals and fertilizers on an as-needed basis.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →